A QUICK FLOORING REPAIR JOB
My customer’s floor was torn up to repair some structural issues and I was asked to do the finish work.
My customer’s floor was torn up to repair some structural issues and I was asked to do the finish work.
Another cabinet made 40 years ago with particle board. The dark paint was textured and the ceiling had an the popcorn texture. Again, yuk! The ceiling was scraped smooth and patched, so were the walls. And the vanity was outfitted… Read More »REMODELING A BATHROOM (3)
The building I’m in was a warehouse built before 1910. The vanity and faucets in this master bath are from the 1980s, when the building was redeveloped for housing. Yuk! New cabinets, new countertop and plumbing hardware, plus paint, new… Read More »REMODELING A BATHROOM (2)
This chair was damaged by a visitor at one of my customer’s beachfront AirBNB condos. Appearance wasn’t an issue; making it strong was.