Skip to content
Home » Project Blog » REMODELING A BATHROOM (2)

REMODELING A BATHROOM (2)

  • by

The building I’m in was a warehouse built before 1910. The vanity and faucets in this master bath are from the 1980s, when the building was redeveloped for housing. Yuk! New cabinets, new countertop and plumbing hardware, plus paint, new caulk, shelves and a frame for the permanently attached mirror.

OLD-VANITY-OPEN-DOORS REMODELING A BATHROOM (2)
PXL_20220809_173004634-Medium REMODELING A BATHROOM (2)
PAINTING-ABOVE-TUB REMODELING A BATHROOM (2)
TUB-HARDWARE-BEFORE-AND-AFTER-1024x576 REMODELING A BATHROOM (2)
TEST-FITTING-THE-VANITY REMODELING A BATHROOM (2)
NEW-VANITY-COUNTER REMODELING A BATHROOM (2)
NEW-VANITY-TOP-IN-BOX REMODELING A BATHROOM (2)
NEW-VANITY-FACE-NO-DOORS REMODELING A BATHROOM (2)
VANITY-DOORS-BEING-PAINTED REMODELING A BATHROOM (2)
MIRROR-FRAME-AGAINST-BRICK REMODELING A BATHROOM (2)
BLUE-BATHROOM-FINISHED REMODELING A BATHROOM (2)
RAW-EDGE-SHELVES-ABOVE-TOILET REMODELING A BATHROOM (2)

Leave a Reply

Your email address will not be published. Required fields are marked *